How a vessel or barge becomes a floating data center
A floating data center is a data center whose building is a hull. The IT equipment is the same as on land. What changes is the platform it stands on, how it gets power and cooling, and the rules that apply to it.
Concept visualization, not an approved design
Interactive diagram
Eight systems on one platform
Select an area of the plan to see what it does and what we look at when we assess it for a project.
Conceptual plan view. Not to scale, not an engineering drawing or approved design.
Data center modules
Containerised or prefabricated data halls placed on deck or in converted holds. Layout follows rack density, service clearances, hot and cold aisle arrangement and maintenance access.
What we assess
Intended IT load and rack density
Module type: containerised, prefabricated or built-in
Zoning between IT, plant and marine spaces
System by system
Technical overview
01
Marine platform
The hull is the foundation. A barge offers a large, flat deck and simple hydrostatics; a converted ship may bring existing machinery spaces and accommodation but tighter internal geometry.
Hull condition, class history and remaining life
Intact stability with the added topside weight
Mooring arrangement, fendering and berth exposure
02
Structural infrastructure
Data modules and plant are heavy and concentrated. Foundations have to carry them into the hull's strength members, isolate vibration and allow modules to be lifted on and off.
Deck strength and permissible point loads
Foundation and seating design for modules
Vibration and motion limits for IT equipment
03
Data center modules
Containerised or prefabricated data halls placed on deck or in converted holds. Layout follows rack density, service clearances, hot and cold aisle arrangement and maintenance access.
Intended IT load and rack density
Module type: containerised, prefabricated or built-in
Zoning between IT, plant and marine spaces
04
Power distribution
Most concepts take primary power from shore through a high-voltage connection, with transformers, switchgear and UPS on board. Backup generation is assessed case by case against site rules and emissions limits.
Available grid capacity at the berth
Redundancy target for distribution and UPS
Backup power concept and fuel or storage options
05
Cooling systems
Heat can be rejected to air through dry coolers or, where permitted, to the surrounding water through a closed-loop heat exchanger. Liquid cooling for high-density racks changes the whole thermal chain and is assessed early.
Thermal load and its profile over the day and year
Water temperature, depth and discharge permits
Air, liquid or hybrid cooling architecture
06
Fire protection
A floating data center has to satisfy both marine fire safety thinking and data center practice. Detection, suppression, compartmentation and escape routes are planned together with the authority that will approve them.
Applicable rules: flag, class, port and local codes
Detection and suppression type per space
Structural fire protection and escape routes
07
Network connectivity
Fiber lands at the quay and crosses to the platform through flexible connections designed for the vessel's movement. Diverse routes reduce the chance of a single cut isolating the site.
Fiber availability and carriers near the berth
Diverse entry routes onto the platform
Meet-me room and carrier-neutral options
08
Monitoring & control
One control room watches both worlds: hull, mooring, ballast and bilge alongside power, cooling and IT environment. Alarms and data feed a single operating picture.
Integration of marine and DCIM monitoring
Remote operation and staffing model
Cyber security of operational systems
Capacities, dimensions and ratings are not stated on this page on purpose. They depend on the platform, the site, the available grid connection and the approvals obtained, and are defined during a project-specific technical assessment.
Have a vessel, barge or berth in mind?
Share what you know about the platform or site. We will tell you which of these eight systems decides feasibility in your case.