Project development

Your project. Our engineering approach.

Six stages, each ending in a decision. You can stop after any of them with a clear picture of where the concept stands.

  1. 01

    Initial project discussion

    A call or meeting about your objective, timeline and what you already have: a vessel, a barge, a berth, a target load or just an idea.

  2. 02

    Platform & site information review

    We go through the documents you can share, such as drawings, class records, site plans and grid or fiber information, and list what is missing.

  3. 03

    Technical feasibility assessment

    We test the concept against the constraints that decide it: structure and stability, power availability, heat rejection, connectivity and permitting.

  4. 04

    Preliminary concept development

    A preliminary arrangement of modules and plant, with the assumptions behind power, cooling and redundancy written down.

  5. 05

    Engineering scope definition

    What detailed engineering is needed, in which order, and which specialists or approving bodies must be involved.

  6. 06

    Project planning & coordination

    A plan that connects engineering, approvals, shipyard or site works and commissioning, with the next decisions clearly marked.

Before the first call

Information that speeds up the first assessment

All of this is optional. If you have only some of it, or none, get in touch anyway. We will work out together what is needed.

Request a project discussion
  • Vessel or barge typeOptional
  • Vessel dimensionsOptional
  • Existing platform specificationsOptional
  • Intended IT capacity, if knownOptional
  • Available power infrastructureOptional
  • Cooling requirementsOptional
  • Intended deployment locationOptional
  • Fiber connectivity availabilityOptional
  • Project objectivesOptional

Ready for stage one?

The first discussion is where we find out together whether your concept is worth developing further.